2009 Impact Evaluation of San Diego Gas & Electric's Participating Load Pilot Program, Part 1. Ex Post Final Report
Categories: Demand Response, Program Evaluation - View PDF
September 17, 2010 - Dan Hansen and Dave Armstrong
This report describes several analyses conducted in association with a load impact evaluation of San Diego Gas and Electric Company’s (“SDG&E”) Participating Load Pilot (“PLP”) Program during the 2009 program year. These analyses include estimation of ex post load impacts for each PLP event, a summary and description of the 1-minute telemetry data collected for the two PLP aggregators, and an assessment of the performance of the “meter-before/meter-after” baseline method that is used by the California ISO (CAISO) to confirm performance during events.
Citation & Download
Steven D. Braithwait, Dan Hansen, David Armstrong, Jess Reaser, 2009 Impact Evaluation of San Diego Gas & Electric’s Participating Load Pilot Program, Part 1. Ex Post Final Report, September 17, 2010.